Trigon Associates, llc

Dura Cluster Water Storage and Distribution System

Construction Management and supervision services for the construction of two 500-cubic meter elevated water storage tanks, one 3000 cubic meter ground storage tank, 11.2 km of transmission pipeline and over 85 km of water distribution lines in multiple towns/villages. Project Cost –  $13M

Share this: