Trigon Associates, llc

Well Flow Monitoring System

A first-of-its-kind in the West Bank, this project consisted of providing a highly computerized monitoring system for 40 water production wells, 3 booster stations and 3 reservoirs scattered throughout the West Bank. The system transmits information via a telecommunications system to a central control room located at the West Bank Water Department (WBWD) offices in […]

Read More →

Roadway Maintenance Programs Development

Led the development of several programs related to short and long-term maintenance of roadways throughout the West Bank.  Some of the key objectives of these programs were to establish formal reactive and preventive maintenance procedures; better sustain existing roads throughout the West Bank; effectively respond to emergencies and complaints; build a computerized maintenance management system […]

Read More →

Roadways Damage Assessment Study

Assessed numerous roadway segments that had experienced various problems and modes of failure. Identified the root cause of failures in each case and developed remedial actions necessary to repair the roadways. The efforts were documented in a report titled “Assessment Study for Failures on Various USAID-Funded Roadways”.

Read More →

Packaged Wastewater Treatment Plants Feasibility Study

Worked in concert with USAID and the PWA, criteria were established to select candidate communities, and the plan is to design and install one or two WWTPs.  

Read More →

Operation and Maintenance (O&M) Services for Water Well and Booster Station Facilities

Worked closely with the West Bank Water Department (WBWD) to improve operational conditions for water well and booster station facilities. A key component of this effort included the development of a Computerized Maintenance Management System (CMMS) for creating, tracking and managing all work orders associated with the facilities. Also provided operational assistance of the facilities; […]

Read More →

Gaza Water Reservoirs and Pumping Facilities

Led the environmental assessment efforts and supported construction mobilization, safety, quality, and environmental efforts and provide ongoing construction management services for four (4) new water storage reservoirs and associated booster stations.

Read More →

Dura Cluster Water Storage and Distribution System

Construction Management and supervision services for the construction of two 500-cubic meter elevated water storage tanks, one 3000 cubic meter ground storage tank, 11.2 km of transmission pipeline and over 85 km of water distribution lines in multiple towns/villages. Project Cost –  $13M

Read More →

Al Yamoun and Qabatia Wastewater Treatment Plants

Engineering, design and environmental/permitting services associated with two (2) new wastewater treatment plants, one in the Al Yamoun area and one near Qabatia in the West Bank.  The units were designed to handle a range of flow rates for two different phases as well as to be flexible enough to allow easy expansion of the […]

Read More →

Al Jaba’ – Nuba Main Transmission Pipeline

Construction Management and supervision services for a new 11.5 km long transmission pipeline to benefit approximately 60,000 people in the Hebron Governorate. Project Cost – $3.9M

Read More →